Production
Setting up advanced production
Configure the optional advanced workflow before creating your first advanced order.
3 min read
Configure the optional advanced workflow before creating your first advanced order.
Step by step
- 1Open Production → Advanced Production → Settings as the workspace owner. Enable Advanced Production, Work centres and Routings. Enable multi-level BOMs only if you use subassemblies.
- 2In Work Centres, create the departments, machines or teams that perform work. Configure their calendars, available capacity and applicable labour or overhead rates.
- 3In Routings, define the ordered operations for the product, each work centre and its setup and run times. For example: Cutting → Assembly → Painting → Packing.
- 4Use Production Setup for the available setup tools and work-centre presets. Review any preset before creating centres so it fits your business.
- 5In Production Costing → Settings, enable Shop floor and Material issue. Enable Labour costing and Overhead absorption only when their rates, rules and accounts are ready.
- 6Select a Work in Progress asset account and the applicable absorption accounts with your accountant. Configure Employee rates and Overhead rules as needed.
- 7Configure optional Quality and output settings, inspection plans and Production Planning approval controls before releasing orders.
Advanced features are workspace-specific and opt-in. Setup changes do not rewrite the frozen routing or costing snapshots of already released orders.
