Production
Quality, batches and finished output
Inspect production results, manage rework and receive eligible finished goods.
3 min read
Inspect production results, manage rework and receive eligible finished goods.
Step by step
- 1In Quality and output → Settings, enable the features required by your workspace. Configure a BOM's normal loss allowance where appropriate.
- 2Enable batch and expiry tracking only for the relevant products. Create the product's inspection plan under Plans if quality control is required.
- 3Record inspection results under Inspections against the correct order and plan. Review failures before proceeding.
- 4Use Rework for the available rework process and resolve outstanding quality requirements.
- 5Under Output, select an eligible order whose operations are finished and required quality checks allow receipt.
- 6Review quantities and manufacture dates, add expiry details where required and include configured additional outputs. Receive finished output.
- 7Review the received batch in Inventory → Stock Batches and check its traceability information.
The BOM loss allowance represents finished-output loss, not extra component waste. The current screen allows one output receipt per order; verify all outputs before posting.
